给排水设计前言 英文翻译 少点也行 求一篇给排水相关的英文文献及翻译

…… 你在做毕业设计吧?推荐你用灵格斯翻译软件翻译一下,再润色一下就可以用了
And tower water supply drainage work is compared with in general multilayer building and low tier of buildings water supply drainage work , fundamental theory and reckoning are identical in the field of some , tier of numbers are many because of the tower , the building altitude is big , the building function is broad , building structure is complicated but, what be accepted the external world condition restricting waits, tower water supply drainage work is listed in disregarding being to be still extent on technology depth,have exceeded low tier of buildings water supply drainage work category, The number having the following few characteristics tower water supply draining off equipment is many and, instant the source of water that the rate of flow giving a water yield and draining away water depends on , rational water supply of economy sewerage form and , breathable appropriate treatment draining off pipeline problem and, to ensure that water supply safety is reliable , the administration draining away water unobstructed and defending is convenient. Main tower water supply drainage work characteristic introduces following right away as follows:
1, the high-rise building storey is many , the altitude is big. Quiet water pressure in water supply system and hot water system is very big , is guarantee pipeline and an accessory be free from be destroyed, must carry out the rational vertical stroke on water supply system and hot water system to the subarea , add to set up the equipment relaxing the pressure as well as centre and the roof water box, make system work intact. 2, the tower function complicated , catches fire after possibility is big , catch fire to spread prompt, the personnel evacuates and dives to save difficulty. For this purpose, must set up interior safe reliable fire water-supply system , satisfy fire control of all kinds call for, the fire water-supply design should "keep a foothold saving self " and , Fang Ke swear to put out a fire in time , prevent a grave accident from happening. The advanced measure taking precautions against earthquakes , having guarded against settlement , guarded against noise , the water-proof hammer , guarded against pipeline expansion and shrinkage deflection , guarded against pressure must consider a pipeline as the tower demanding 3, comparatively highly to guarding against noise , taking precautions against earthquakes and so on , the interior pipeline and equipment kind being numerous , the pipeline being long , the noise source and the centre being much but. To ensure that the pipeline does not leaks water, not damaging building structure and decoration , not affecting an environment, makes system safety work.
最后说一句,同学,给排水还是多不错的。

The high-rise construction compares for the water dewatering excavation and the general multistory building and the underlying bed construction for the water dewatering excavation, the elementary theory and the computational method in certain aspects are the same, but because the high-rise construction layer are many, the height of building is big, the construction function is broad, the construction structure is complex, as well as receives the ambient condition the limit and so on, high-rise construction for water dewatering excavation, regardless in technical depth, in the breadth, has surpassed the underlying bed building for the water dewatering excavation category, and has the following some characteristic high-rise construction to be many for the water drainage's use population, the instant the water source which depends for the water volume and the draining water current capacity, as well as the economy is reasonableFor the water drainage system form, and deals with drainage channel's ventilation issue properly, guaranteed that the water supply safe reliable, draining water is unobstructed and the maintenance management is convenient. Below gives the water dewatering excavation on the high-rise construction the main feature introduction to be as follows: 1, the high-rise construction layer many, is highly big. Is very big for in the aqueous system and the hot water system's hydrostatic pressure, to guarantee that the pipeline and the fitting are exempt from the destruction, must to give the aqueous system and the hot water system carries on the reasonable vertical district, Canada supposes the reduced pressure equipment as well as middle and the roof water tank, causes the systems operation to be complete. 2, high-rise construction's function is complex, catches fire the possibility to be big, after catching fire, spreads rapidly, the personnel disperse and save goal the difficulty. Therefore, must establish the safe reliable indoor fire prevention to give the aqueous system, satisfies each kind of fire the request, moreover the fire prevention should “the foothold help oneself” for the water design, only then guaranteed that the prompt suppress a fire, prevents the heavy accident to occur. 3, the high-rise construction to the noise suppression sound, quakeproof and so on requests are high, but interior conduit and the device category is many, the pipeline is long, the noise source and the center of origin are many, must consider that the pipeline quakeproof, against subsidence, the noise suppression sound, against impingement, against pipeline expand and contract the dislodgement, against pressure higher measure. Guaranteed that the pipeline water leakage, does not damage the construction structure and the decoration, does not affect the environment, causes the system safety movement.

相关评说:

  • 刘要18654096162: 请高手翻译摘要,中译英,谢谢,在线等... -
    海州区动力: ______ Topic: aluminum alloy strip surface processing workshop de...
  • 刘要18654096162: 谁有给排水的英文论文(3000字左右,最好带中文翻译?,急求
    海州区动力: ______ 童鞋你好!你要的外文资料我给你找到了!请您参考附件中的资料文档!网上基本很难找到免费给你服务的!我在这里给你点搜索国际上常用的外文数据库:---------------------------------------------------------- ⑴ISI web of knowledge Engineering Village2...
  • 刘要18654096162: 给排水图名翻译 -
    海州区动力: ______ 1 给排水设计施工说明 Plumbing And Fire System Construction Instructions2 地下一层给排水平面图 basement pluming plan 3 首层给排水平面图 first floor pluming plan 4 卫生间给排水大样图 toilet pluming detail drawing 我们院就是这样写的,不知道跟你们的一样不的~消防的话加上 Fire Hydrant 就可以了
  • 刘要18654096162: 我学的是暖通行业,需要将本专业的简单结介绍翻译成英文的,求大家帮助....
    海州区动力: ______ With solid thermal, mechanical engineering, electrical theory of automatic control basic knowledge and skills, proficient in computer application to national economic sectors in theory, thermal energy, environmental protection, heat, water, heating ...
  • 刘要18654096162: 谁有建筑给排水的英文文献啊,给哥们一份啊 谢谢啊 -
    海州区动力: ______ 保加利亚人写的英文文献,参考一下吧.对商业建筑供水需求的调查 Investigation of Water Demand in Commercial Buildings Petya Ivanova (1), Assoc.Prof. Dimiter Alitchkov(2),petia3@abv.bg alichkov_fhe@uacg.bg University of Architecture, Civil...
  • 刘要18654096162: 给排水设计师,给排水工程师用英语怎么说 -
    海州区动力: ______ Water's supply & Drainage Designer Water's supply & Drainage Engineer 也有叫 pumping engineer
  • 刘要18654096162: "洗衣房及健身桑拿房的等部位给排水管线的预留设计"怎么翻译? -
    海州区动力: ______ "洗衣房及健身桑拿房的等部位给排水管线的预留设计"Reserved design of water supply and waste water disposal pipes in laundry, gyms and massage room etc.配合业主方完成园林水景的给排水设计 Cooperate with the owner to complete the...
  • 刘要18654096162: 国外的建筑给排水设计相关的书籍 -
    海州区动力: ______ 建议你看一本《美国建筑给水排水设计)的书,是卢安坚著的,比较全面.英文名字是 plumbing system design in US 经济日报 出版社出版的.
  • 刘要18654096162: 给排水中主干管怎么翻译? -
    海州区动力: ______ 主干管和干管应该没有什么区别,如果一定要区别,可以用general General pipe of water supply and drainage
  • 刘要18654096162: 给排水设计 -
    海州区动力: ______ 从取水工程,到泵站,再到水厂,再到管网,如果是一个新建城区,那么内容肯定很多.我建议还是先把以前的教材看一遍,才又必要去看案例,毕竟基本的理论是很重要的,我也相信到了大4以前学的基本内容还是很多印象都不会很深刻.毕竟每个设计点,它的情况不一样,需要你根据基本理论进行变通.至于,你要的材料,我可以去找我师傅要一要,不过是四川地区的一个扩建项目.